Subscribe to our mailing list


Name

Email

 


projects


Sector:

Royal Albert Dock

Mitchellson Formwork and Civil Engineering
Groundwork, Sub and Superstructure... [read more]

245 Hammersmith Road

Mitchellson Formwork and Civil Engineering
Groundwork, Sub and Superstructure.. [read more]

Battersea Power Station Phase 2

Mitchellson Formwork and Civil Engineering
Substructure package.. [read more]

The Coal Drops Yard

Mitchellson Formwork and Civil Engineering
.. [read more]

4 Kingdom Street Paddington

Mitchellson Formwork and Civil Engineering
Substructure consisting of Pile caps and Drainage with a number of slip formed cores rising 14 levels followed by a Superstructure of Concrete topping on metal deck (17,900m2) after Steel Frame erection ... [read more]

Queen Anne's Gate

Mitchellson Formwork and Civil Engineering
We have been issued an initial limited letter of intent for a Sub and Superstructure Package consisting of Secant Piling, Basement Excavation and Construction, Part Top Down Construction, Drainage, Mixture of RC and Postensioned Concrete Frame with 6 floor levels including roof. .. [read more]

30 Broadwick Street

Mitchellson Formwork and Civil Engineering
Package - Foundation and basement construction.... [read more]

Creechurch

Mitchellson Formwork and Civil Engineering
Groundworks, drainage, substructure.... [read more]

Great Ormond Street Hospital

Mitchellson Formwork and Civil Engineering
A £2.7million new extension to exiting ward and treatment blocks. .. [read more]

Midlands Good Shed and Block G1

Mitchellson Formwork and Civil Engineering
Midlands Good Shed and Block G1 for Kier's at the Argent site in Kings Cross... [read more]

St Johns Hill, Clapham

Mitchellson Formwork and Civil Engineering
The proposed project is for the design and construction of 528 dwellings, a community centre and commercial space which is to be carried out in three phases. .. [read more]

Hammersmith Grove

Mitchellson Formwork and Civil Engineering
The new project is the second phase of a previous development and involves the construction of a new office building with an overall area of around 200,000 ft² over 12 storey's... [read more]

Skanska & Brent Civic Centre Win the LGC Award

Mitchellson Formwork and Civil Engineering
The Brent Civic Centre project wins the innovation category in the LGC Business Partnership Awards. Skanska and Brent Civic Centre demonstrate collaborative working at its finest, as they scoop the award for the Innovative Partnership Category... [read more]

Goodman Fields for Berkeley First

Mitchellson Formwork and Civil Engineering
Rising graciously into the East London skyline near the banks of the Thames, Goodman’s Fields offers prestigious studio, one, two and three bedroom apartments and penthouses, each created for upmarket living. Centered in 2 acres of greenery that offers the perfect retreat, coupled with a luxury health center, pool, gym and 24-hour concierge desk, tenants will be equally at home inside, as out... [read more]