St Johns Hill, Clapham


The proposed project is for the design and construction of 528 dwellings, a community centre
and commercial space which is to be carried out in three phases.


Phase 1 consists of 153
dwellings in two blocks and the scope Of Mitchellson’s work consists of Enabling works for Piling, Pile Attendance, Construction of Basement to one block, Construction of Pile Caps and foundations, Construction of a traditional RC Structure consisting of Flat Post Tensioned slabs, Columns, Walls and beams along with internal and external drainage, incoming services and stoning up for External works areas.

Contract Value aprox £6,700,000 Duration 48 weeks

Value: £6,700,000

Mitchellson Formwork and Civil Engineering